Connecting The Power Supply To The Network And Executing A Learn Run - Siemens SIDOOR ATD401W System Manual

Atd4xxw series, door control systems for industrial applications
Hide thumbs Also See for SIDOOR ATD401W:
Table of Contents

Advertisement

Connecting and commissioning

9.4 Connecting the power supply to the network and executing a learn run

9.4
Connecting the power supply to the network and executing a learn
run
Connecting the power supply to the network
1. Connect the power supply to the network.
– SIDOOR NT40: When the supply is switched on, the device is ready for operation.
Note
On-site fuse
The on-site fuse must not exceed 10 A.
Note
For the motors M4, MDG400. MDG400NMS and M5, the output transmission must be
checked prior to each learn run with SIDOOR ATD4xxW and adjusted if necessary.
Perform a learn run
Note
Ensure that 15 to 25 cm of the door's range of motion from the CLOSED position are
unobstructed during the learn run.
1. Make sure that the door is in the CLOSED position.
2. Press and hold down the learn run button S401.
3. Connect the voltage supply with slot X3 on the SIDOOR ATD4xxW control unit
4. For the M4, MDG400. MDG400NMS and M5 motors, the output transmission [mm/rev]
must be configured for the initial commissioning or motor adaptation (see section Learn
run (Page 29)). For the M4, MDG400 and M5 motors, set default value to 176 mm/rev.
The learn run buttons S401 on the IDOOR ATD4xxW must be pressed and held again.
5. The learn run starts automatically, and the learn run button can be released. (See table
Starting a learn run when the line voltage is applied (Page 162))
266
The green LED lights up.
ATD4xxW Door Controller for Industrial Applications
System Manual, 01/2017, A5E38080677-AB

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sidoor atd420wSidoor atd410wSidoor atd430w

Table of Contents