8 ] Installing The Top Cover Assy And Thermal Tape - Brother QL-1060N Service Manual

P-touch
Hide thumbs Also See for QL-1060N:
Table of Contents

Advertisement

[ 8 ] Installing the Top Cover ASSY and Thermal Tape

(1) Put the top cover ASSY into the slit on the under cover.
Note: Confirm that the top cover ASSY is opened and closed smoothly.
(2) Insert the two top cover shafts from the inside of the hooks on the top cover until they hit
the end of the hooks.
Fig. 3.2-38 Installing the Top Cover ASSY and Thermal Tape (1)
(3) Assemble the back cover.
Fig. 3.2-39 Installing the Top Cover ASSY and Thermal Tape (2)
Hook
III- 50
Top cover ASSY
Top cover shaft
Hook
2
Back cover
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents