Tps3 01 Installation Instructions For: 400/600 Amp S1/S2 & All Se Panels; Internal Phase Labeling Connections; Figure 4: 400/600 Amp S1/S2 And All Se Panels - Tps3 01 Unit With The Nk Accessory Kit; Table 4: Contents For Installation In 400/600 Amp S1/S2 And All Se Panels - Siemens TPS3 01 Internal Manual

Surge protective device tps3 series
Table of Contents

Advertisement

V DANGER
Hazardous voltage.
Will cause death or serious injury.
Keep Out.
Qualified personnel only.
Disconnect and lock off all power before
working on this equipment.
TPS3 01 Installation Instructions for: 400/600 amp S1/S2 and All SE Panels
If model number includes W option suffix, additional instructions
follow:
Note that this installation is very similar to TPS3 used in S3 Panels
except that the neutral connector is wired rather than pigtailed
and the neutral connector is at line end of the panel.
The following instructions are for the installation of Siemens TPS3 01
and L1 SPD modules in Siemens 400/600 amp S1/S2 and all SE Panels.
All hardware is supplied for complete installation of the TPS3 module.
Figure 4: 400/600 Amp S1/S2 and all SE Panels -
TPS3 01 Unit with the NK Accessory Kit
Table 4: Contents for Installation in 400/600 Amp S1/S2
and all SE Panels
Item Description
1
TPS3 (See Page 2, Table 1)
2
1/4-20 Hex Head SEMS Assembly
3
10-24 Head Thread Forming Screw
4
TPS3 Neutral Connection Point
5
TPS3 Mounting Bracket
6
Phase Connectors
7
1/4" Carriage Bolt
8
1/4" Belleville Washer Nut
Determine the mounting location of the TPS3 in the distribution
equipment. If it is to be mounted in the top of the distribution equipment
or relocated after installation, internal phase labeling connections
must be changed to ensure proper diagnostic board indication.
CONDUCTING DIELECTRIC AND/OR
HI-POTENTIAL TESTING WILL CAUSE
INTERNAL DAMAGE TO TPS3 UNIT.
Do not perform dielectric or high potential
These modifications should be made prior to installation. If the TPS3
module is field installed in the bottom, or if it is mounted in a factory
assembled panelboard, the internal phase label connections are correct
as shipped.

Internal Phase Labeling Connections

A single 14 wire ribbon cable is attached to the display pcb. When the
ABC phase sequence changes to CBA, the single connector is removed
from the normal "ABC" jack and installed in the jack labeled "CBA".
Lock off all power supplying this equipment before working on it.
Remove the trim and dead front.
Install the mounting bracket (Item 5) to the base rail as shown
in Figure 3 using two (2) of the #10 thread forming screws
(item 3).
Position the TPS3 unit on the panel base rail so that the phase tabs are
on top of the interior bus and the four mounting holes line up with the
two holes in the base rail and the two holes in the mounting bracket.
Attach the TPS3 unit (item 1) to the base rail using four (4) of the #10
slotted hex washer head thread forming screws (item 3) provided as
shown in Figure 4.
Fasten unit to the main bus using the phase connectors (item 6). The
connectors will be attached to the unit with three (3) 1/4" hex head
SEMS assemblies (item 2) provided. Then they will be connected to
the interior with three (3) 1/4" carriage bolts and three (3) belleville
washer nuts (items 7 & 8). Do not tighten at this time.
Fasten TPS3 neutral to panel neutral at the neutral connection point
(item 4).
Qty.
Torque all connections to the values as specified on the installation
1
and maintenance instruction label affixed to the rear of the dead front.
3
Replace dead front and trim.
6
-
1
3
3
3
NOTICE
tests with the TPS3 unit installed.
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tps3 l1Tps3 02Tps3 l5Tps3 06Tps3 l2Tps3 l6 ... Show all

Table of Contents