GE L60 Instruction Manual page 287

Line phase comparison system ur series
Hide thumbs Also See for L60:
Table of Contents

Advertisement

5 SETTINGS
5.5 GROUPED ELEMENTS
an undervoltage condition, which in turn is controlled by the
operand with a 10 ms coordination timer. If a
VT FUSE FAIL OP
trip from distance in not required, then it can be disabled with the
setting. Configure the
LINE
LINE PICKUP DISTANCE TRIP
operand to perform a trip action if the intent is apply zone 1 extension.
PICKUP RCL TRIP
The zone 1 extension philosophy used here normally operates from an under-reaching zone, and uses an overreaching
distance zone when reclosing the line with the other line end open. The
setting is provided to achieve
AR ACCELERATE
zone 1 extension functionality if external autoreclosure is employed. Another zone 1 extension approach is to permanently
apply an overreaching zone, and reduce the reach when reclosing. This philosophy can be programmed via the autore-
close scheme.
5
Figure 5–60: LINE PICKUP SCHEME LOGIC
GE Multilin
L60 Line Phase Comparison System
5-155

Advertisement

Table of Contents
loading

Table of Contents