About This Document - Siemens FDS229-A Technical Manual

Fds229 series. alarm sounder with supplementary optical indication
Hide thumbs Also See for FDS229-A:
Table of Contents

Advertisement

1 About this document

Target group
Product Manager
Project Manager
Installation personnel
Commissioning personnel
Maintenance personnel
Building Technologies
Fire Safety
Goal and purpose
This document contains all necessary information on the alarm sounder with
additional optical indicator FDS229. Following the instructions consistently will
ensure that the product can be used safely and without any problems.
Target groups
The information in this document is intended for the following target groups:
Activity
Is responsible for information passing
between the manufacturer and regional
company.
Coordinates the flow of information
between the individual groups of people
involved in a project.
Coordinates the deployment of all
persons and resources involved in the
project according to schedule.
Provides the information required to run
the project.
Assembles and installs the product
components at the place of installation.
Carries out a performance check
following installation.
Configure the product at the place of
installation according to customer-
specific requirements.
Check the product operability and
release the product for use by the
operator.
Searches for and corrects malfunctions.
Carries out all maintenance work.
Checks that the products are in perfect
working order.
Searches for and corrects malfunctions.
Reference document and source language
The source language of this document is German (de).
The reference version of this document is the international version in English.
The international version is not localized.
The reference document has the following designation:
ID_x_en_--
x = modification index, en = English, -- = international
Applicable documents
Qualification
Has obtained suitable specialist training
for the function and for the products.
Has attended the training courses for
Product Managers.
Has obtained suitable specialist training
for the function and for the products.
Has attended the training courses for
Project Managers.
Has received specialist training in the
area of building installation technology
or electrical installations.
Has obtained suitable specialist training
for the function and for the products.
Has attended the training courses for
commissioning personnel.
Has obtained suitable specialist training
for the function and for the products.
1
5
010095_j_en_--
2013-02-22

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fds229-r

Table of Contents