Welcome; Initial Inspection - Keysight N1911A Installation Manual

P-series power meter
Hide thumbs Also See for N1911A:
Table of Contents

Advertisement

1
Getting Started

Welcome

Welcome to the Keysight Technologies P-Series Power Meters' Installation Guide.
This guide shows you how to:
– physically check the power meter
– adjust the carrying handle
– switch it on and confirm the meter passes the power-on self test
– connect it to a P-Series power sensor
– connect it to an 8480, N8480 Series or E-Series power sensor
– perform a zero and calibration routine on an 8480, N8480 Series or E-Series
– make connections to the rear panel
– use the Keysight IO Libraries Suite to configure the remote programming
– attach the rack mounting kits (supplied with Option 908 or Option 909)
Both single and dual channel power meters with a variety of rear panel
NOTE
configurations have been used for the illustrations in this guide. Your power
meter may differ in detail to those shown.

Initial inspection

Please inspect the shipping container for damage. If the shipping container or
packaging material is damaged, it should be kept until the contents have been
checked mechanically and electrically. If there is mechanical damage, notify the
nearest Keysight Technologies office. Keep the damaged shipping materials (if
any) for inspection by the carrier and a Keysight representative. If required, you
can find the
Before continuing, please ensure you have read and understood the preceding
safety information.
4
power sensor
interfaces
"Sales and Technical Support"
on page 11.
Keysight N1911A and N1912A Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

N1912a

Table of Contents