Linking (Only Solar-Log 1000 And 2000); Fig.: Solar-Log™ Network Configuration - Solar-Log 200 Manual

Hide thumbs Also See for 200:
Table of Contents

Advertisement

Configuration Menu

16.13.7 Linking (only Solar-Log 1000 and 2000)

The linking function is to be used when there are not enough interfaces on one Solar-Log™ or the cable
lengths between the Solar-Log™ and the various inverters exceeds the RS485 specifications.
The link between the data loggers is established with an Ethernet connection. This TCP/IP connection can
be established with various technologies such as fiber optics, wireless LAN, radio relay. For the Solar-Log™
network it is only relevant that the connection is fast and reliable.
The master within Solar-Log™ network always has to be a Solar-Log 2000 PM+. The Solar-Log 2000 can
be used as the slaves.
The link is used to exchange control commands and responses between the Solar-Log™ devices.
Each Solar-Log™ has to transfer yield data itself to a server.
Procedure:
Select configuration from
Enter
the
Click next to the box with the mouse.
After entering the IP address an additional input box appears.
A
maximum of nine slaves
SAVE
the settings.
Fig.: Solar-Log™ network confi guration
Note!
172
Configuration | Feed-in Management | Networking
IP address
of the first slave.
can be active inside of a network.
If there are no inverters connected to the master in the master/slave mode, the plant
Configuration | Feed-in Management | Plant parameters
parameter under
Configuration | Plant | Forecast
recast value under
.
and fo-
have to be set to 0.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 200 and is the answer not in the manual?

Questions and answers

Related Products for Solar-Log 200

This manual is also suitable for:

300120025020005001000

Table of Contents

Save PDF