Download Print this page

Preparing For The Maestro Fixed Angle Stand Installation; Preparing The Work Surface; Using The Top Foam Packing Material As An Work Surface Offset - FlexRadio Systems Maestro Installation Manual

Fixed angle stand
Hide thumbs Also See for Maestro:

Advertisement

Preparing for the Maestro Fixed Angle Stand Installation

If the Maestro is powered on, power it off by pressing the Power Button on the top. Disconnect all cables.
Use a flat, well-lighted surface such as a table or work bench to perform the Maestro Fixed Angle Stand
installation.
You may want to use several small containers to store and organize the screws that will be used as part of
the Fixed Angle Stand installation.
Make sure to observe basic ESD control procedures to prevent static discharges that may damage
sensitive electronics components inside the Maestro, such as grounding yourself to reduce static electrical
build up.

Preparing the Work Surface

The top of the foam insert used in packing the Maestro will be used as a work surface to prevent
scratches to the front of the unit and to level the Maestro while attaching the Fixed Angle Stand.
Using the Top Foam Packing Material as an Work S urface Offset
The knobs on the front of the Maestro does not allow for the unit to lie flat on its front to facilitate easy
installation of the Fixed Angle Stand. Therefore the part of the Maestro packing material will be used as
an offset to create a flat work surface for installing the Fixed Angle Stand.
As shown in the picture below, use the top of the foam packing material and the plastic bag the Maestro
was packed in to create a convenient work surface offset. Allow the plastic bag to extend to the left to
protect the tops of the knobs. Alternately a soft cloth may be used in place of the plastic bag if desired.
Page 3
© 2016 FlexRadio Systems, v1.0.0

Advertisement

loading