Operation; Pre-Operation Checks - Mitsubishi Electric FR-F500 Instruction Manual

Hide thumbs Also See for FR-F500:
Table of Contents

Advertisement

3.4 Operation

3.4.1 Pre-operation checks

Before starting operation, check the following:
• Safety
Perform test operation after making sure that safety is ensured if the machine should become out of control.
• Machine
Make sure that the machine is free of damage.
• Parameters
Set the parameter values to match the operating machine system environment.
• Test operation
Perform test operation and make sure that the machine operates safely under light load at a low frequency.
After that, start operation.
51
OPERATION
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents