Verifying Operation - Fluke DTX-1800 Technical Reference Handbook

Dtx series cable analyzer
Hide thumbs Also See for DTX-1800:
Table of Contents

Advertisement

DTX Series CableAnalyzer
Technical Reference Handbook

Verifying Operation

The tester performs a basic self test when you turn it on. To
run a more thorough self test for an acceptance test or as
part of a routine equipment check:
1
Connect the main and remote testers using one of the
methods shown in Figure 1-10.
2
Turn the rotary switch to SPECIAL FUNCTIONS.
D
3
Use
to highlight Self Test; then press
Permanent link
adapter
Channel
adapter
F1
F2
F3
TEST
EXIT
ENTER
SAVE
AUTO
SINGLE
TEST
TEST
SETUP
SPECIAL
MONITOR
FUNCTIONS
TALK
Twisted pair adapters
1-24
H
.
PASS
TEST
FAIL
TALK
TONE
LOW BATTERY
DTX-REFERENCE module
TEST
TALK
Figure 1-10. Self Test Connections
4
If fiber modules are installed in addition to twisted pair
adapters, select Mainframe.
P
5
Press
.
If the tester reports an error, refer to "If Something Seems
Wrong" on page 14-9.
Fiber modules
amd168.eps

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dtx-ltDtx-1200Dtx-cltDtx-clt certifiberDtx-elt

Table of Contents