Moving the rack

The fully populated IBM iDataPlex Rack Type 7825 cabinet meets the UL/CSA/IEC
60950-1 stability test standards. Because these standards apply only to a rack
cabinet in an installed location, IBM enforces additional standards to ensure stability
when the rack cabinet is rolled on its casters. See Table 3 for empty and fully
populated rack cabinet weights.
Note: The door opening must be at least 82.75 in. high and 33.5 in. wide for the
When you move a rack cabinet, observe the following precautions.
Statement 8:
DANGER
20
IBM iDataPlex Cluster Solution: Installation and Service Guide
IBM iDataPlex Rack Type 7825 cabinet to pass through the opening.
Table 3. IBM iDataPlex Rack Type 7825 cabinet weights
Configuration
Empty (no doors or covers)
Populated
v Plug power cords from devices in the rack cabinet into electrical outlets
that are located near the rack cabinet and are easily accessible.
v Each rack cabinet might have more than one power cord. Be sure to
disconnect all power cords in the rack cabinet before servicing any
device in the rack cabinet.
v Install an emergency-power-off switch if more than one power device
(power distribution unit or uninterruptible power supply) is installed in
the same rack cabinet.
v Connect all devices installed in a rack cabinet to power devices installed
in the same rack cabinet. Do not plug a power cord from a device
installed in one rack cabinet into a power device installed in a different
rack cabinet.
Weight
250 kg (551 lb)
1360 kg (3000 lb)