Assembly Of The Sinumerik 810D - Siemens SINUMERIK 810DE powerline Equipment Manual

Sinumerik 810d configuration ccu
Hide thumbs Also See for SINUMERIK 810DE powerline:
Table of Contents

Advertisement

3 Design and Installation of the 810D

3.2 Assembly of the SINUMERIK 810D

Open equipment
These modules are open equipment. This means they may only be installed in
housings, cabinets, or in electrical equipment rooms that can only be entered or
accessed with a key or tool. Housings, cabinets, or electrical equipment rooms
may only be accessed by trained or authorized personnel. An external fire pro-
tection casing is required.
3.2
Assembly of the SINUMERIK 810D
Preparing for
You require the following tool to assemble the SINUMERIK 810D:
installation
S
S
Position in the
The CCU box must be installed to the right of the SIMODRIVE power supply
overall assembly
module. It is possible to mount a further power module to the left of the box.
Installation of the
The CCU box is fitted to the right of the power supply. 4 M5 screws are recom-
mended for fixing.
CCU box
1. Remove the plastic cover over the DC link bars by loosening it with a flat
2. With two M4 Torx screws, connect the DC link bars of the power supply unit
3. Place the cover into the matching cut-outs with the plastic lugs facing down-
3-38
Screwdriver for slot-head screws sizes 0 and 1
Screwdriver for Torx screws M4 and M5
screwdriver in the gap on the top and then folding it forward and down.
and CCU box and possibly the next module also.
Ensure that all the DC link connecting screws are securely fastened.
ward and close the DC link by folding the cover backward until the topside
latch clicks.
SINUMERIK 810D Equipment Manual Configuration CCU (PHC) – 03/2006 Edition
Copyright © Siemens AG 2006

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinumerik 810d powerline

Table of Contents