GE L30 Instruction Manual page 102

Ur series line current differential system
Hide thumbs Also See for L30:
Table of Contents

Advertisement

3.3 PILOT CHANNEL COMMUNICATIONS
1.
With power to the relay off, remove the IEEE C37.94 module (type 76 or 77 module) as follows. Record the original
location of the module to help ensure that the same or replacement module is inserted into the correct slot.
2.
Simultaneously pull the ejector/inserter clips located at the top and at the bottom of each module in order to release the
module for removal.
3.
Remove the module cover screw.
4.
Remove the top cover by sliding it towards the rear and then lift it upwards.
5.
Set the timing selection switches (channel 1, channel 2) to the desired timing modes (see description above).
6.
Replace the top cover and the cover screw.
7.
Re-insert the IEEE C37.94 module. Take care to ensure that the correct module type is inserted into the correct slot
position. The ejector/inserter clips located at the top and at the bottom of each module must be in the disengaged posi-
tion as the module is smoothly inserted into the slot. Once the clips have cleared the raised edge of the chassis,
3
engage the clips simultaneously. When the clips have locked into position, the module is fully inserted.
3-38
Figure 3–40: IEEE C37.94 TIMING SELECTION SWITCH SETTING
L30 Line Current Differential System
3 HARDWARE
GE Multilin

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents