on-off devices, such as stepper motors. In particularly, do not route power cord and network cable
with such devices in parallel because such devices have strong electro-magnetic radiation which is
easy to couple to the camera's transmission line.
Shelter grounds of all devices must be connected together and take single point grounding.
Multi-point grounding easily leads to voltage difference between devices which form circuits to
induce couple electro-magnetic interference.
Power supply for camera and that for PC must be from the same AC power distributor in order to
connect their shelter grounds and avoid multi-point grounding. High-power mechanical and
electrical equipment do not directly use this AC power.
Magnetic ring can be added to the power control cord of camera in order to absorb
electro-magnetic interference signals.
Please keep the suitable humidity and operate with wrist strap, anti-static clothes and shoes to
reduce ESD.
3.1.2.2 Heat Dissipation
Under the condition of a stable condition(temperature and humidity, air flow, installation location,
etc.)the camera will reach a temperature balance in 1 or 1.5 hours, which means that the cover
temperature will not rise any longer. It is important to ensure the cover temperature beyond 50℃ and
there is a temperature difference of 25℃ between inner main heat source and outside cover in this
balanced condition. When the cover temperature is under 50℃, the electronic chip inside will not suffer
damage.
Recommend several good methods of controlling the temperature:
Ambient temperature should be beyond 30℃, it is best to work in an air-conditioned environment.
Installed on the object with good thermal conductivity, such as large metal which is easy to
dissipate heat.
Ensure certain air flow to dissipate heat.
3.2

Software Installation

Application installation steps of host computer are as follows:
Step1
Turn the PC on.
Step2
Double client the installation package and install MV Viewer program according to the prompt
on the interface. You can see Figure 3-1 after installation.
Please get in touch with relevant technical supporter to obtain the installation package.
16

Advertisement

Table of Contents
loading

This manual is also suitable for:

A5b51m/cg4A7200m/cg30A7300m/cg30A7500m/cg20

Table of Contents