Fujitsu ETERNUS AF250 S2 Configuration Manual page 27

All-flash arrays storage
Hide thumbs Also See for ETERNUS AF250 S2:
Table of Contents

Advertisement

Chapter 2
Rack Installation
2.1
Power Distribution Unit Installation (for Regions other than the EMEIA, Central American, and Caribbean Regions)
2
Install the power distribution unit in the rack.
Fasten it to the prepared holes in the pillars with eight M5 screws.
M5 screw
3
Attach the blank panel to the rack front.
The blank panel should be attached at the same height as the power distribution unit.
(Rack pillar: rear)
M5 screw
Power distribution unit
FUJITSU Storage ETERNUS AF250 S2, ETERNUS AF250 All-Flash Arrays Configuration Guide (Basic)
Copyright 2017 FUJITSU LIMITED
(Rack pillar: rear)
Blank panel
(Rack pillar: front)
27
P3AG-1832-04ENZ0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus af250

Table of Contents