Mitsubishi Electric Q81BD-J61BT11 User Manual page 356

Network interface board melsec cc-link system master/local interface board
Table of Contents

Advertisement

INDEX
IND
[A]
Auto return function ................................ 1- 6,4-23
[B]
Backing up parameters ............................. App-57
Station-based block data assurance function
....................................................................... 4-36
Buffer memory details ................................ App- 1
Buffer memory list .......................................... 3- 9
[C]
CC-Link dedicated cable .................. 3- 6,3- 7,3- 8
CC-Link version ......................................... App-70
CC-Link Ver.1 board ..................................... A-20
CC-Link Ver.2 board ..................................... A-20
CC-Link Ver.2 Utility ....................................... 8- 3
Channel No. setting switch ............................ 5- 6
Combinations of Boards with Existing Software
................................................................... App-67
Communication with remote I/O stations ...... 4- 3
Communication between the Master station and
Remote I/O stations ..................................... 10- 1
Communication with the remote device stations
........................................................................ 4- 5
Communication with the local stations ......... 4-10
Communication between the Master station and
Local stations ................................................ 12- 1
Communication with the intelligent device station
....................................................................... 4-16
Communication between the Master station and
Intelligent device station ...................... 13- 1,14- 1
Communication with the Redundant CPU
................................................................... App-47
Component Names and Settings .................. 5- 2
Connection cable............................................ 3- 2
Current link scan time (SW006E) .................. 8- 5
Cyclic transmission ....................................... A-20
Cyclic Transmission Processing Time ...... App-32
[D]
Data link restart (SB0000) ......................... App-17
Data link restart acceptance (SB0040) ..... App-17
Data link restart complete (SB0041)......... App-17
Data link restart result (SW0041) ............. App-22
Data link stop result (SW0045) ................. App-23
Index - 1
Data link stop (SB0002) ............................ App-17
Data link stop acceptance (SB0044) ........ App-17
Data link stop complete (SB0045) ............ App-17
Data link stop/restart ...................................... 4-42
Detailed LED display status (SW0058) .... App-23
Device assignment checklist .................... App-65
Device Monitor Utility .................................... 8-18
Differences from the CC-Link Ver.1 Board
................................................................... App-50
[E]
EMC Directive ........................................... App-85
Error codes ................................................... 15- 1
Error invalid station setting function .............. 4-41
External Dimensions ................................. App-91
[F]
Function List .................................................... 4- 1
[G]
General Specifications .................................... 3- 1
Generic Terms and Abbreviations ................ A-20
[H]
Hardware Test ............................................... 8-15
Host line status (SB0090) ......................... App-21
Host master/standby master operation status
(SB007B) ................................................... App-20
Host mode (SB0060) ................................ App-19
Host parameter status (SW0068) ............. App-24
Host standby master station setting status
(SB0062) ................................................... App-19
Host station number (SW0061) ................ App-24
Host station operation status (SB006E) ... App-20
Host type (SB0061) .................................. App-19
How to Use this Manual ................................ A-19
[ I ]
Increasing the number of cyclic points ......... 4-45
Input data status setting from a data-link faulty
station ............................................................. 1- 6
Installation ....................................................... 5- 4
Installation environment .................................. 5- 4
Intelligent module .......................................... A-20
Installing the software package ...................... 7- 1
Intelligent device station ............................... A-20
Index - 1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q80bd-j61bt11n

Table of Contents