Electrical Installation
November 2017
5. Connect the cable wires (see
6. Ensure proper grounding
7. Tighten the cable gland.
Note
Make sure to arrange the wiring with a drip loop.
8. Seal any unused ports with the enclosed metal plug.
64
(see"Grounding" on page
PTFE tape or other sealant
PTFE tape or other sealant
"Wiring diagram" on page
Torque 7 in-lb (0.8 N-m)
62).
Reference Manual
00809-0100-4408, Rev BA
61).
Electrical Installation