Overview of the Cabinets
IBBS200D
Power
Power
distribution box
Power box of the
heating film
CMUE
Grounding bar
Installing the Base
The installation blocks are placed in the auxiliary
material package of the RFC.
Φ16
Φ16
90°
Concrete
52-60 mm
plinth
Base
Installing the Cabinets
Installing the Cabinets
1 Attaching the Cabinet to the Base
1. RFC
M12x30 Bolt
(×2)
M12x60 B
Spring wa
Flat wash
Expansion
Expansion
tube
Concrete
plinth
2. TMC
Gasket
an oblo
hole
IBBS200T
Power
Power
distribution box
CMUE
Grounding bar
Install two installation
y
blocks on the base
before installing only
the RFC.
Expansion bolt (x4)
Remove the
baffle plates
from the both
sides and the
rear of the
Bolt
base.
asher
her
n
n
Rem
move the front cover
plat
te from the base.
C11H/IBBS200T/IBBS200D
By attaching the IBBS200D as an example, attaching
the TMC11H or the IBBS200T to the base is the same.
Gasket with an
oblong hole
t with
ong
2
2
Level
bar
M12x40
Bolt (×2)
Adjusting pad
M12×30
Bolt(×4)