Siemens SIMATIC PCS 7 Service Manual page 19

Process
Hide thumbs Also See for SIMATIC PCS 7:
Table of Contents

Advertisement

● Ensure that your hardware meets the requirements for PCS 7. You can find more
information in the documentation
Released Modules . If system components are not suitable for the updated version of PCS
7, you must replace them. In some cases, you must adapt or redo the configuration of the
components that have been replaced in the updated project.
● You need upgrade license keys to update PCS 7:
– V7.1 -> V8.0 (additional upgrade license key required)
– V8.x -> V8.2
● The automation system can remain in the RUN state during a software update without
utilization of the new functions. The process can be continued. Program changes can be
downloaded during operation. Functions that require a new library version (for example,
SIMATIC Route Control) require a STOP of the automation system.
● The manual contains some sections that are not listed in the overview. Observe the
information provided in these sections when updating the software and check whether this
information is relevant to your PCS 7 system.
● You do not need any new hardware or firmware for your automation system.
● You want to perform the software update without a great deal of configuration effort.
● The process can always be operator-controlled and monitored, if you use redundant OS
servers and update the software accordingly.
You can find more information about this in the manual
Fault-tolerant Process Control Systems > Guidelines for updating a redundant OS in
runtime.
Note
Projects up to and including PCS 7 V7.1 SP3
If you want to update PCS 7 projects of a version older than and including PCS 7 V7.1 SP3,
the complete software update to at least PCS 7 V7.1 SP4 is required as an intermediate step.
Read the decision-making aid in section: Defining a strategy for the software update
(Page 15)
Note
Archive server
The central archive server (CAS) is not supported. Replace the CAS with the following PC
stations:
● Process Historian as external archive server
● Information Server as reporting system
You can find information on configurations in the documentation
PCS 7; PCS 7 PC Configuration .
You can find information on migration in the documentation
Process Historian Administration .
Software update without utilization of new functions
Service Manual, 03/2016, A5E36200133-AA
3.3 Important Information for Software Update without Utilization of New Functions
Process Control System PCS 7 Catalog Overview;
Process Control System PCS 7;
Introduction
Process Control System
SIMATIC; Process Historian;
19

Advertisement

Table of Contents
loading

Table of Contents