Mitsubishi Electric MELSEC iQ-R Series Programming Manual page 263

Process control function blocks
Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

■SPI operation
• Gain (Kp) is calculated as follows.
Kp = K  PROPORTIONAL
K: Output gain, PROPORTIONAL: Gain
• Output gain (K) is calculated as follows.
Condition
• K value to the deviation (DV) of when the gap width (GW) is equal to 0
DV' (Positive)
0
DV (Negative)
DV'(Negative)
• K value to the deviation (DV) of when the gap width (GW) is
greater than 0
DV' (Positive)
0
DV (Negative)
-GW
GW
DV'(Negative)
DV: Deviation (%), GW: Gap width (%) = Rate of the gap width to the deviation, GG: Gap gain
• Deviation for SPI operation (DV') is calculated as follows.
Condition
DV < -GW
|DV|  GW
DV > GW
DV': Deviation for SPI operation (%)
DV: Deviation (%)
GW: Gap width (%)
GG: Gap gain
• Deviation (DV) for direct/reverse action is calculated as follows.
Condition
Direct action (PN = 1)
Reverse action (PN = 0)
DV: Deviation (%)
PVP (%): PV input value (%)
100
SV(%)=
×(SV-RL)
RH-RL
RH: Engineering value high limit
RL: Engineering value low limit
SV: Setting value
DV (Positive)
When |DV|  GW
GG=1.0
GG=0.5
When |DV| > GW
GG=0.0
DV (Positive)
10.13 Sample PI Control (Enable Tracking for primary loop) (M+P_SPI_T)
Output gain (K)
K = 1
K = GG
K=1-
Deviation for SPI operation (DV')
DV' = -(GG  GW) + (DV + GW)
DV' = GG  DV
DV' = GG  GW + (DV - GW)
Deviation (DV)
DV (%) = PVP (%) - SV (%)
DV (%) = SV (%) - PVP (%)
10 LOOP CONTROL OPERATION
(1-GG)×GW
|DV|
261
10

Advertisement

Table of Contents
loading

Table of Contents