Battery Installation - NEC UNIVERGE SV8100 System Hardware Manual

Hide thumbs Also See for UNIVERGE SV8100:
Table of Contents

Advertisement

Issue 7.0
3 - 64
Figure 3-79
Installing the CHS LARGE BATT BOX using the CHS2U JOINT
BRACKET KIT
5.
Secure the CHS LARGE BATT BOX to the CHS BASE UNIT
using the CHS2U JOINT BRACKET KIT. Refer to
Installing the CHS LARGE BATT BOX using the CHS2U JOINT
BRACKET KIT on page
3.2.2

Battery Installation

1.
Loosen screw on front of CHS LARGE BATT BOX. Refer to
Figure 3-80 Removing CHS LARGE BATT BOX
2.
Swing cover outward and detach from CHS LARGE BATT
BOX.
3-64.
Figure 3-80 Removing CHS LARGE BATT BOX Cover
UNIVERGE SV8100
Figure 3-79
Cover.
Installing the SV8100 Chassis