NEC UNIVERGE SV8100 System Hardware Manual page 133

Hide thumbs Also See for UNIVERGE SV8100:
Table of Contents

Advertisement

UNIVERGE SV8100
System Hardware Manual
Figure 3-78 Floor Mount Spacing Guide
2.
Mark and drill the four holes required for installing the CHS
BASE UNIT.
3.
Align bolt holes in CHS BASE UNIT (see
Mount Spacing Guide on page
and secure using four anchor bolts.
4.
Align and install the CHS LARGE BATT BOX on top of the CHS
BASE UNIT. Refer to
BATT BOX using the CHS2U JOINT BRACKET KIT on page
3-64.
Figure 3-78 Floor
3-63) with holes drilled in floor
Figure 3-79 Installing the CHS LARGE
Issue 7.0
3 - 63

Advertisement

Table of Contents
loading

Table of Contents