Mounting Instructions - Mitsubishi Electric FX3S Quick Start Manual

Programmable logic controller
Hide thumbs Also See for FX3S:
Table of Contents

Advertisement

FX3S QUICK START MANUAL
Standard
REMARK
Compliance with all relevant aspects of the standard.
EMI
EN61131-2: 2007
EMS
Programmable controllers
- Equipment
requirements and tests
n REQUIREMENT FOR COMPLIANCE WITH LVD DIRECTIVE
The following products have shown compliance through direct testing
(of the identified standards below) and design analysis (through the
creation of a technical construction file) to the European Directive for
Low Voltage (2006/95/ EC) when used as directed by the appropriate
documentation.
Type: Programmable Controller (Open Type Equipment)
Models: MELSEC FX3S series manufactured
From March 1st, 2013
FX3S-_ _MR/ES
Where _ _ indicates: 10, 14, 20, 30
Standard
REMARK
EN61131-2: 2007
Programmable controllers
- Equipment
requirements and tests
n CAUTION FOR COMPLIANCE WITH EC DIRECTIVE
Installation in Enclosure: Programmable logic controllers are open-
type devices that must be installed and used within conductive control
boxes. Please use the FX3S Series programmable logic controllers
while installed in conductive shielded control boxes. Please secure the
control box lid to the control box (for conduction). Installation within a
control box greatly affects the safety of the system and aids in shielding
noise from the programmable logic controller.
Item
Specification
Ambient
0 to 55°C (32 to 131°F) when operating and
Temperature
-25 to 75°C (-13 to 167°F) when stored
Ambient
5 to 95%RH (no condensation) when operating
Humidity
Frequency
(Hz)
When
10 to 57
installed on
Vibration
57 to 150
DIN rail
Resistance *1
When
10 to 57
installed
57 to 150
directly
Shock
147m/s² acceleration, Action time: 11ms, 3 times by half-sine pulse
Resistance *1
in each direction X, Y, and Z
Noise Resis-
By noise simulator at noise voltage of 1,000Vp-p, noise width of
tance
1μs, rise time of 1ns and period of 30 to 100Hz
Dielectric
1.5kVAC for one minute
Withstand
500VAC for one minute
Voltage *2
Insulation
5MΩ or more by 500VDC
Resistance *2
megger
Class D grounding (grounding resistance: 100Ω or less) <Common
Grounding
grounding with a heavy electrical system is not allowed.> *3
Working
Free from corrosive or flammable gas and excessive conductive
Atmosphere
dusts
Working
<2000m *4
Altitude
6
Mitsubishi Electric Automation, Inc.
• Radiated Emissions
• Conducted Emissions
• Radiated electromagnetic field
• Fast transient burst
• Electrostatic discharge
• High-energy surge
• Voltage drops and interruptions
• Conducted RF
• Power frequency magnetic field
The equipment has been assessed as a component
for fitting in a suitable enclosure which meets the
requirements of EN61131-2: 2007
Acceleration
Half ampli-
(m/s²)
tude (mm)
-
0.035
4.9
-
-
0.075
9.8
-
Between each terminals *2 and ground
terminal
Terminal
Main units
Between power supply terminal
(AC power) and ground terminal
Between power supply terminal
(DC power) and ground terminal
Between input terminal (24VDC)
and ground terminal
Between output terminal (relay)
and ground terminal
1. The criterion is shown in IEC61131-2.
2. Dielectric withstand voltage and insulation resistance are shown above.
3. For common grounding, refer to Section 4.2.
4. The PLC cannot be used at a pressure higher than the atmospheric pressure to
avoid damage.

3.2 MOUNTING INSTRUCTIONS

n INSTALLATION LOCATION
Install the PLC in an environment conforming to the generic
specifications, installation precautions and notes.
Installation location in enclosure
n AFFIXING THE DUST PROOF SHEET
The dust proof sheet should be affixed to the ventilation port before
beginning the installation and wiring work. For the affixing procedure,
refer to the instructions on the dust proof sheet. Be sure to
remove the dust proof sheet when the installation and wiring work is
completed.
n PROCEDURES FOR INSTALLING TO AND DETACHING
Sweep
FROM DIN RAIL
Count for
X, Y, Z:
The products can be installed on a DIN46277 rail [35mm (1.38") wide].
10 times
(80 min
1) Push out all DIN rail mounting hooks (below fig.A).
in each
direction)
1)
A
Dielectric Strength
Insulation Resistance
1.5 kVAC for one minute
500VAC for one minute
5MΩ or more by
500VDC megger
500VAC for one minute
1.5 kVAC for one minute
B
1)
A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents