Grouped Elements; Overview; Setting Group; Phase Current - GE G30 Instruction Manual

Ur series generator protection system
Hide thumbs Also See for G30:
Table of Contents

Advertisement

5.6 GROUPED ELEMENTS

5.6GROUPED ELEMENTS
Each protection element can be assigned up to six different sets of settings according to setting group designations 1 to 6.
The performance of these elements is defined by the active setting group at a given time. Multiple setting groups allow the
user to conveniently change protection settings for different operating situations (for example, altered power system config-
uration, season of the year, etc.). The active setting group can be preset or selected via the
Control elements section later in this chapter). See also the Introduction to elements section at the beginning of this chap-
ter.
PATH: SETTINGS
GROUPED ELEMENTS
 SETTING GROUP 1
5
5-132

SETTING GROUP 1(6)

 TRANSFORMER
 PHASE CURRENT
MESSAGE
 NEUTRAL CURRENT
MESSAGE
 GROUND CURRENT
MESSAGE
 NEGATIVE SEQUENCE
MESSAGE
 CURRENT
 GENERATOR
MESSAGE
 UNBALANCE
 SPLIT PHASE
MESSAGE
 VOLTAGE ELEMENTS
MESSAGE
 LOSS OF
MESSAGE
 EXCITATION
 ACCIDENTAL
MESSAGE
 ENERGIZATION
 POWER
MESSAGE
 STATOR
MESSAGE
 GROUND
G30 Generator Protection System

5.6.1 OVERVIEW

SETTING GROUPS
5.6.2 SETTING GROUP
See page 5–133.
See page 5–138.
See page 5–148.
See page 5–155.
See page 5–162.
See page 5–166.
See page 5–168.
See page 5–172.
See page 5–184.
See page 5-186.
See page 5-188.
See page 5-191.
5 SETTINGS
menu (see the
GE Multilin

Advertisement

Table of Contents
loading

Table of Contents