Siemens SIMATIC IPC477D Operating Instructions Manual page 104

Hide thumbs Also See for SIMATIC IPC477D:
Table of Contents

Advertisement

Commissioning the device
4.1 General information on commissioning
Requirement
● The terminal compartment cover of the PRO device is open.
● The device is connected to the power supply.
● The protective conductor is connected.
● The connection cables are plugged in correctly.
● The following hardware is available for initial commissioning:
– One USB keyboard
– One USB mouse
Note
Switching on the PRO device
An external on/off switch is recommended to avoid having to continually open the terminal
compartment cover.
104
SIMATIC IPC477D, IPC477D PRO
Operating Instructions, 11/2016, A5E31347228-AF

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents