Operation Sequence; Power On Sequence - Sanyo SUPER BL P5 Manual

Table of Contents

Advertisement

6. OPERATION
6.1

Operation Sequence

The frequency of power ON/OFF should be 10 times/H or less, and 50 times/day or less.
6.1.1

Power ON Sequence

Control power ON (r, t)
Sequence power ON (CN1)
Amplifier ready output (RDY)
Start ready ON (external switch)
Main circuit power supply
Dynamic brake release
Start ready complete (SRDY)
1
The time period from main circuit power ON to SRDY is approx. 1 sec. However, in
case of single phase power of Amplifier with 50A capacity, that will be approx. 1.5 sec.
Install a spark killer
on the magnetic contactor
(Okaya Electric Industries Co.,
Ltd.: CRE-50500)
Prevention against
common/ normal
mode noise
200 V to
230 VAC
50 Hz to
60Hz
Circuit
braker
1
The dotted line denotes an option.
2
RDY1 and RDY2 in the safety circuit are optional.
3
The thermostat output in the external regenerative resistor can be connected to
general-purpose input CN1 of the amplifier.
(R, S, T)
Emergency
stop
Safety circuit
Start
ready
MC
MC
MC
MC
MC
Fast-blown fuse
Controller
2.5 Sec
or less
Approx. 1.0 Sec
System
External regenerative resistor
error
2
Y
P
RDY1
RDY2
R
U
S
V
T
W
r
t
CN2
CN1
OP
Fig. 6-1
6-2
Release
1
1
External regenerative resistor:
Overheating detection thermostat
Input to
3
CN1
U
V
Motor
W
Holding
E
brake
Encoder
signal
24 VDC
1
RY
DC power supply
for brake

Hide quick links: