Chapter 20 - Commissioning Instructions
8

ONLOAD CHECKS

Warning:
Onload checks are potentially very dangerous and may only be carried out by
qualified and authorised personnel.
Onload checks can only be carried out if there are no restrictions preventing the energisation of the plant, and the
other devices in the group have already been commissioned.
Remove all test leads and temporary shorting links, then replace any external wiring that has been removed to
allow testing.
Warning:
If any external wiring has been disconnected for the commissioning process, replace
it in accordance with the relevant external connection or scheme diagram.
8.1

CONFIRM CURRENT CONNECTIONS

1.
Measure the current transformer secondary values for each input using a multimeter connected in series
with the corresponding current input.
2.
Check that the current transformer polarities are correct by measuring the phase angle between the
current and voltage, either against a phase meter already installed on site and known to be correct or by
determining the direction of power flow by contacting the system control centre.
3.
Ensure the current flowing in the neutral circuit of the current transformers is negligible.
4.
Compare the values of the secondary phase currents and phase angle with the measured values, which
can be found in the MEASUREMENTS 1 column.
If the Local Values cell is set to Secondary, the values displayed should be equal to the applied secondary
voltage. The values should be within 1% of the applied secondary voltages. However, an additional allowance must
be made for the accuracy of the test equipment being used.
If the Local Values cell is set to Primary, the values displayed should be equal to the applied secondary voltage
multiplied the corresponding voltage transformer ratio set in the CT AND VT RATIOS column. The values should be
within 1% of the expected values, plus an additional allowance for the accuracy of the test equipment being used.
8.2

CONFIRM VOLTAGE CONNECTIONS

1.
Using a multimeter, measure the voltage transformer secondary voltages to ensure they are correctly rated.
2.
Check that the system phase rotation is correct using a phase rotation meter.
3.
Compare the values of the secondary phase voltages with the measured values, which can be found in the
MEASUREMENTS 1 menu column.
Cell in MEASUREMENTS 1 Column
VAB Magnitude
VBC Magnitude
VCA Magnitude
VAN Magnitude
VBN Magnitude
VCN Magnitude
C/S Voltage Mag.
454
Corresponding VT ratio in CT AND VT RATIOS column
Main VT Primary / Main VT Sec'y
CS VT Primary / CS VT Secondary
P14D