Fronius Symo Service Manual page 148

Table of Contents

Advertisement

Available languages

Available languages

Inserting the EcoFIL:
148
(5)
(2)
(1)
(3)
Remove the protective film from the
1
thermally conductive pad fort he new
EcoFil PC board and ensure that the
pads do not slip out of place or fall off
during installation.
Thread in and position the new EcoFIL
2
Fit the EcoFIL with nine 4x9 TX20
3
screws (5)
[2 Nm]
Connect all cables and plug connec-
(2)
4
tions (3) to the EcoFIL
Fit the Datcom insert with two 5x10
5
TX25 screws (2)
[1.2 Nm]
Fit the ground connection with a 4x9
6
TX20 screw (1)
[2 Nm]
Fit the AC cable harness with four 5x10
7
TX20 screws (4)
[3.5 Nm]
Insert the Recerbo, close the inverter
8
and place it in the wall bracket (see
"Replacing the display PC board -
Recerbo", "Opening and closing the
device" and necessary „Replacing the
(4)
Overvoltage PC board" sections)
Switch on the inverter and then carry out a
fan test via the display (see operating inst-
ructions)

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents