Download  Print this page

Precautions Relating To The Installation Of The Base Unit - Mitsubishi Electric MELSEC A Series User Manual

Hide thumbs

Advertisement

(4) Places where corrosive or inflammable gas exists.
(5) Places where a large amount of dust, iron powder and other conductive
powder, oil mist, salt or organic solvent exists.
(6) Places exposed to direct sunlight.
(7) Places where a strong electric or magnetic field exists.
(8) Places where mechanical vibrations or impacts are transmitted directly to
the module body.

4.1.3 Precautions relating to the installation of the base unit

The following precautions must be observed when installing a PC to an operation
panel or other bases considering fully the operability, maintainability, and resistance
to the environment.
(1) Unit mounting position
To ensure proper ventilation and make module replacement easy, provide
a clearance of 80mm (3.15in.) or more between the top of the unit and any
surrounding structure or equipment.
28mm
(1.10 in.)
For coaxial
data link
Main base unit
39mm
(1.54 in.)
For optical
data link
Represents the ceiling of panel,
wiring conduit, or component.
Extension base unit
Parallel installation
23
80mm (3.15 in.)
or more
*3

Advertisement

Table of Contents

   Also See for Mitsubishi Electric MELSEC A Series

   Related Content for Mitsubishi Electric MELSEC A Series

Comments to this Manuals

Symbols: 0
Latest comments: