Installation Instructions - Miele PG 8583 CD Installations Plan

Laboratory glassware washer
Hide thumbs Also See for PG 8583 CD:
Table of Contents

Advertisement

Installation Instructions

Installation
requirements
Environmental
requirements
Electrical
connection
Equipotential
bonding and
earthing
Plumbing
Communication
modules
page 1 /7 
 
 
Please read and observe the instructions in the operating instruction
manual and the service documents regarding installation and setting
up of this laboratory glassware washer.
Installation should only be carried out by authorized installers in
accordance with valid regulations, relevant standards and health and
safety codes.
The machine must be commissioned and operators trained in its use by
Miele Service or by an approved Miele Service Partner only.
Condensate can build up in the area surrounding the machine. Any
cabinetry and fixtures in the room must be suitable.
If the machine is installed under a countertop (built-under model), a
stainless steel panel must be installed above the door opening to protect
the countertop from moisture damage. A suitable stainless steel cover
plate is available to order from Miele.
Connection to the electrical supply must be carried out in accordance
with local and national safety regulations. The power cord must be
protected from the risk of thermal damage.
It is recommended to make an electrical connection via a plug and
socket so that electrical safety checks can be carried out easily. The
socket must be accessible after machine installation.
For hard-wired machines, a main switch must be provided on site, which
must completely isolate the machine from the power supply with a
contact gap of at least 1/8'' (3 mm).
The plug and socket as well as the main switch must be easily
accessible after the machine has been installed.
For added safety the machine should be protected with a residual current
device with a trip current of 30 mA.
If necessary, an equipotential bond with good contact connection must
be provided in accordance with all appropriate national and local
regulations.
Equipotential bonding and grounding must be completed before the
machine is commissioned.
The machine can be plumbed in to the cold water, hot water,
demineralized water and drainage points without a backflow protection
device.
Use the Y-connector supplied with the machine to connect the water
intake to the machine (KW) and the steam condenser (DK). Alternatively,
you can provide an additional cold water supply to connect to the steam
condenser.
Ethernet and RS232 communication modules are available as optional
extras. They are not supplied with the machine. The fuse box for the
modules should be installed near the machine for transferring and
printing process data. They must be installed and connected in
accordance with local codes and standards.