Operating the SuperFlo
VS Variable Speed
®
Pump from the Control Panel
If power is connected to the pump motor, pressing any of the following buttons
referred to in this section could result in the motor starting. Failure to recognize
this could result in personal injury or damage to equipment.
1.
Press the START key and the pump will run the
programmed 24 hour duration schedule. The
START event will be stored. Should a power
outage occur, the pump will automatically re-start
at STEP 1 when power is restored.
2.
The pump will always run the PRIMING sequence
when it starts from the OFF state, including
when it automatically restarts following a power
outage. The default Prime setting is defined in the
“Priming” section, see page 14.
3.
The pump then starts running in STEP 1 at the
programmed DURATION and SPEED. The
“ACTIVE LED” for STEP 1 will switch ON. The
DURATION and SPEED setting LEDs along with
the respective bar graph LED will blink back and
forth every three (3) seconds.
4.
This sequence will then repeat for STEP 2 and
then STEP 3 without the pump stopping.
5.
At the end of STEP 3, the pump will wait if
necessary for the completion of the 24-hour
schedule. During this waiting period (if
applicable), all of the “active step LEDs” will
remain OFF. However, the START LED will still
be illuminated. After completion of the 24 hour
schedule, the system restarts at STEP 1 and this
cycle will repeat indefinitely until the user presses
the STOP key.