Download Print this page

3One data IES608-2F Hardware Installation Manual page 9

8-port 10/100m industrial ethernet switch

Advertisement

series adopt 35mm DIN-Rail installation, the installation steps as
fellows:
1. Examine the DIN-Rail attachment
2. Examine DIN Rail whether be firm and the position be
suitability or not.
3. Insert the top of the DIN-Rail into the slot just below the stiff
metal spring.
4. The DIN-Rail attachment unit will snap into place as shown
below.
Wiring
Wiring
Requirements
Requirements
Wiring
Wiring Requirements
Requirements
Be sure to disconnect the power cord before installing and/or wiring
your Ethernet Switch.
Calculate the maximum possible current in each power wire and
common wire. Observe all electrical codes dictating the maximum
current allowable for each wire size. If the current goes above the
maximum ratings, the wiring could overheat may causing serious
damage to your equipment. You should also pay attention to the
following items:
1. Use separate path to route wiring for power and devices. If power
wiring and device wiring paths must cross make sure the wires
are perpendicular at the intersection point.
2. NOTE: Do not run signal or communications wiring and power
wiring in the same wire conduit. To avoid interference, wires
with different signal characteristics should be routed separately.
3. You can use the type of signal transmitted through a wire to
determine which wires should be kept separate. The rule of
YourSerial and Data Communications Expert
Shenzhen 3onedata T echnologyCo.,Ltd

Advertisement

loading

Related Products for 3One data IES608-2F