3Com 4200G 12-Port Configuration Manual page 615

4200g family
Hide thumbs Also See for 4200G 12-Port:
Table of Contents

Advertisement

<Sysname> reboot
Before restarting the switch, make sure you have saved all other configurations that you want, so as to
avoid losing configuration information.
2)
Loading host software
Loading the host software is the same as loading the Boot ROM program, except that the file to be
downloaded is the host software file, and that you need to use the boot boot-loader command to select
the host software used for next startup of the switch.
After the above operations, the Boot ROM and host software loading is completed.
Pay attention to the following:
The loading of Boot ROM and host software takes effect only after you restart the switch with the
reboot command.
If the space of the Flash memory is not enough, you can delete the unused files in the Flash
memory before software downloading. For information about deleting files, refer to File System
Management part of this manual.
Ensure the power supply during software loading.
Loading Procedure Using FTP Server
As shown in
Figure
1-9, the switch is used as the FTP server. You can telnet to the switch, and then
execute the FTP commands to upload the Boot ROM switch.btm to the switch.
1)
Loading the Boot ROM
Figure 1-9 Remote loading using FTP server
Step 1: As shown in
address is 10.1.1.1)
Step 2: Configure the IP address of VLAN-interface 1 on the switch to 192.168.0.28, and subnet mask
to 255.255.255.0.
Figure
1-9, connect the switch through an Ethernet port to the PC (whose IP
1-12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4200g 24-port4200g 48-portSwitch 4800g pwr 24-port

Table of Contents