Table Of Contents - Carrier AquaEdge 19XR series Start-Up, Operation And Maintenance Instructions Manual

Single-stage or two-stage semi-hermetic centrifugal liquid chillers with pic ii controls and hfc-134a 50/60 hz
Table of Contents

Advertisement

WARNING
Operation of this equipment with refrigerants other than
those cited herein should comply with ANSI/ASHRAE 15
(latest edition). Contact Carrier for further information on
use of this chiller with other refrigerants.
DO NOT ATTEMPT TO REMOVE fittings, covers, etc.,
while chiller is under pressure or while chiller is running.
Be sure pressure is at 0 psig (0 kPa) before breaking any
refrigerant connection.
CAREFULLY INSPECT all relief devices, rupture discs,
and other relief devices AT LEAST ONCE A YEAR. If
chiller operates in a corrosive atmosphere, inspect the
devices at more frequent intervals.
DO NOT ATTEMPT TO REPAIR OR RECONDITION
any relief device when corrosion or build-up of foreign
material (rust, dirt, scale, etc.) is found within the valve
body or mechanism. Replace the device.
DO NOT install relief devices in series or backwards.
USE CARE when working near or in line with a com-
pressed spring. Sudden release of the spring can cause it
and objects in its path to act as projectiles.
CAUTION
Failure to follow these procedures may result in personal
injury or damage to equipment.
DO NOT STEP on refrigerant lines. Broken lines can whip
about and release refrigerant, causing personal injury.
DO NOT climb over a chiller. Use platform, catwalk, or
staging. Follow safe practices when using ladders.
USE MECHANICAL EQUIPMENT (crane, hoist, etc.) to
lift or move inspection covers or other heavy components.
Even if components are light, use mechanical equipment
when there is a risk of slipping or losing your balance.
BE AWARE that certain automatic start arrangements
CAN ENGAGE THE STARTER, TOWER FAN, OR
PUMPS. Open the disconnect ahead of the starter, tower
fans, or pumps.
USE only repair or replacement parts that meet the code
requirements of the original equipment.
DO NOT VENT OR DRAIN waterboxes containing
industrial brines, liquid, gases, or semisolids without the
permission of your process control group.
DO NOT LOOSEN waterbox cover bolts until the water-
box has been completely drained.
DO NOT LOOSEN a packing gland nut before checking
that the nut has a positive thread engagement.
PERIODICALLY INSPECT all valves, fittings, and piping
for corrosion, rust, leaks, or damage.
PROVIDE A DRAIN connection in the vent line near each
pressure relief device to prevent a build-up of condensate
or rain water.
DO NOT re-use compressor oil or any oil that has been
exposed to the atmosphere. Dispose of oil per local codes
and regulations.
DO NOT leave refrigerant system open to air any longer
than the actual time required to service the equipment. Seal
circuits being serviced and charge with dry nitrogen to pre-
vent oil contamination when timely repairs cannot be
completed.
SAFETY CONSIDERATIONS . . . . . . . . . . . . . . . . . . . . 1,2
INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
ABBREVIATIONS AND EXPLANATIONS. . . . . . . . . . 5
CHILLER FAMILIARIZATION . . . . . . . . . . . . . . . . . . . 5-9
Chiller Information Nameplate . . . . . . . . . . . . . . . . . . . . 5
System Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Cooler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Condenser . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Motor-Compressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Control Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Economizer (Optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Frequency Drive (Optional). . . . . . . . . . . . . . . . . . . . . 7
Storage Vessel (Optional) . . . . . . . . . . . . . . . . . . . . . . . . 7
REFRIGERATION CYCLE. . . . . . . . . . . . . . . . . . . . . 10,11
MOTOR AND OIL COOLING CYCLE . . . . . . . . . . 11,12
VFD COOLING CYCLE. . . . . . . . . . . . . . . . . . . . . . . . . . . 12
LUBRICATION CYCLE. . . . . . . . . . . . . . . . . . . . . . . . 12-15
Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Oil Reclaim System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
STARTING EQUIPMENT . . . . . . . . . . . . . . . . . . . . . . 15-17
(Optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
(Optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Unit-Mounted VFD (Optional) . . . . . . . . . . . . . . . . . . . . 16
CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-64
Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
PIC II System Components . . . . . . . . . . . . . . . . . . . . . . 17
(Optional)
ICVC Operation and Menus. . . . . . . . . . . . . . . . . . . . . . 21
• GENERAL
PIC II System Functions . . . . . . . . . . . . . . . . . . . . . . . . . 43
2
CONTENTS
Page

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aquaedge 19xrv series

Table of Contents