Si39 - Daikin R410As Service Manual

Vrv heat pump 50hz
Table of Contents

Advertisement

Special Control
3.2.2 Oil Return Operation in Heating Operation
Outdoor Unit Actuator
Compressor
Outdoor unit fan
Four way valve
Main motorized valve (EV1)
∗Value in ( ) are for RXYQ5M only.
Subcooling motorized valve (EV2)
Hot gas bypass valve (SVP)
Oil equalization valve (SVO)
Receiver gas charging valve (SVL)
Receiver gas discharging valve
(SVG)
Non-operating unit gas discharging
valve (SVSG)
Non-operating unit liquid pipe stop
valve (SVSL)
Ending conditions
* In the case of multi-outdoor-unit system,
Master unit: Performs the operations listed in the table above.
Slave units: Operating units perform the operations listed in the table above.
Non-operating units perform the operations listed in the table above from the oil return operation.
(Non-operating unit stops during "oil return preparation operation".)
* Actuators are based on RXYQ16M.
Fan
Electronic expansion valve
<In condition of oil return operation>
Compressor cumulative operation time > 8 hours
(However, 2 hours after turning power on first time.)
76
Oil return preparation
operation
Upper limit control
STEP8
or
STEP9
ON
SH control
0 pls
OFF
ON
OFF
OFF
OFF
ON
2 min.
Indoor unit actuator
Thermostat ON unit
Stopping unit
Thermostat OFF unit
Thermostat ON unit
Stopping unit
Thermostat OFF unit
Oil return operation
124 Hz + ON + OFF
OFF
OFF
0 pls (1400pls)
0 pls
ON
ON
OFF
OFF
OFF
ON
• 6 min.
or
• Ts - Te<5
Heating oil return operation

Si39-302

Post-oil-return operation
1-step increase from
(74 Hz + OFF + OFF) to
(Pc - Pe>0.4 MPa) time
STEP9
ON
180 pls
0 pls
ON
ON
OFF
OFF
OFF
ON
• 160 sec.
or
• Pc - Pe>0.4MPa
OFF
OFF
OFF
512 pls
512 pls
512 pls
Function

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents