Download Print this page
Carrier 50GS030 Installation, Start-Up, And Operating Instructions Manual

Carrier 50GS030 Installation, Start-Up, And Operating Instructions Manual

50gs series, 50gx series sizes 030-060

Advertisement

Quick Links

50GS, 50GX
3-Phase Single-Packaged
Air Conditioners
Visit _r_r_r+ C" _ Ir r ier+ _" o [n
Installation, Start-Up, and Operating instructions
50GS,GX Sizes 030=060
HEATING & COOLING
NOTE:
Read the entire instruction
manual belk_re starting the
installation.
This symbol --> indicates a change since the last issue.
TABLE OF CONTENTS
SAFETY CONSIDERATIONS
.....................................................
l
Introduction ....................................................................................
2
RECEIVING AND INSTALLATION
..........................................
2
Check Equipment ......................................................................
2
IDENTIFY UNIT ................................................................
2
INSPECT SHIPMENT ........................................................
2
Provide Unit Support ................................................................
2
ROOF CURB .......................................................................
2
SLAB MOUNT ...................................................................
2
GROUND MOUNT ............................................................
2
Provide Clearances ....................................................................
2
Field Fabricate Ductwork .........................................................
2
Rig and Place Unit ....................................................................
2
INSPECTION ......................................................................
7
INSTALLATION
................................................................
7
Connect Condensate Drain .......................................................
7
Install Duct Connections ..........................................................
8
CONFIGURING
UNITS
FOR DOWNFLOW
(VERTI-
CAL) DISCHARGE ............................................................
8
Install Electrical Connection ....................................................
9
HIGH-VOLTAGE
CONNECTIONS
................................ lI)
SPECIAL PROCEDURES
FOR 208-V OPERATION ...lI)
CONTROL VOLTAGE CONNECTIONS
....................... lI)
STANDARD CONNECTION
..........................................
11
TRANSFORMER
PROTECTION ....................................
11
PRE-START-UP
..........................................................................
13
START-UP ...................................................................................
13
CHECK FOR REFRIGERANT
LEAKS .......................... 13
START LIPCOOLING SECTION AND MAKE ADJUST-
MENTS ..............................................................................
13
CHECKING COOLING CONTROL OPERATION ....... 13
CHECKING
AND
ADJUSTING
REFRIGERANT
CHARGE ...........................................................................
14
INDOOR
AIRFLOW
AND
AIRFLOW
ADJUST-
MENTS ..............................................................................
14
For 2081230V .....................................................................
14
FOR 460-V GE MOTORS ................................................
14
COOLING SEQUENCE OF OPERATION ..................... 14
MAINTENANCE .........................................................................
17
AIR FILTER ......................................................................
20
EVAPORATOR
BLOWER AND MOTOR ..................... 21
CONDENSER COIL EVAPORATOR
COIL, AND CON-
DENSATE DRAIN PAN ..................................................
21
CONDENSER
FAN ..........................................................
22
ELECTRICAL CONTROLS
AND WIRING .................. 22
REFRIGERANT
CIRCUIT ...............................................
22
EVAPORATOR
AIRFLOW .............................................
22
C99001
Fig. liUnit
50GS and 50GX
METERING DEVICE
ACUTROL DEVICE ............. 22
LIQUID LINE STRAINER ..............................................
22
Troubleshooting ............................................................................
22
Start-Up Checklist ........................................................................
22
NOTE TO INSTALLER
Belk_rethe installation, READ THESE
INSTRUCTIONS
CAREFULLY
AND
COMPLETELY.
Also,
make sure the User's Manual and Replacement Guide are leli with
the unit after installation.
SAFETY CONSiDERATiONS
Installation
and servicing
of air-conditioning
equipment
can be
hazardous
due to system
pressure
and electrical
components.
Only
trained
and qualilied
personnel
should
install,
repair,
or service
air-conditioning
equipment.
Untrained
personnel
can perli_rm
basic
maintenance
l_.lnctions of
cleaning
coils and lilters. All other operations
should be perlormed
by trained
service
personnel.
When
working
on air-conditioning
equipment,
observe
precautions
in the literature,
tags, and labels
attached
to the uniL and other sali_ty precautions
that may apply.
Follow
all sali_ty codes. Wear salbty glasses
and work gloves.
Use
quenching
cloth lor unbrazing
operations.
Have fire extinguisher
available
lkn" all brazing
operations.
Consult
a qualified
installer
or
service
agency
lin" inli_rmation
or assistance.
The
qualified
in-
staller
or agency
must
use only factory-authorized
kits or acces-
sories
when
modifying
this product.
Manufacturer
reserves
the right
to discontinue,
or change
at any time, specifications
or designs
without notice
and without
incurring obligations.
PC 101
Printed in U.S.A.
Catalog
No. 50GS-4SI
Pg 1
2-06
Replaces:
New

Advertisement

loading
Need help?

Need help?

Do you have a question about the 50GS030 and is the answer not in the manual?

Questions and answers