PROCEDURES UP TO OPERATION
This chapter describes the procedures before operation.
1.
Checking the specifications of the master/intelligent device module
Check the specifications of the master/intelligent device module. (Page 18 SPECIFICATIONS)
2.
Installation of the master/intelligent device module
Connect the master/intelligent device module to the CPU module. For details, refer to the following.
MELSEC iQ-F FX5U User's Manual (Hardware)
MELSEC iQ-F FX5UC User's Manual (Hardware)
3.
Power supply wiring
Connect a power cable to the master/intelligent device module. (Page 52 Power Supply Wiring)
4.
Unit test
A master/intelligent device module is individually tested to check whether it normally operates. (Page 110 Hardware Test)
5.
Network construction
Configure the system and set the parameters which are required for start-up, the station number for slave station, and
transmission speed.
• Network wiring (Page 53 CC-Link Network Wiring)
• Parameter setting (Page 58 PARAMETER SETTINGS)
• Slave station number and transmission speed setting (manual of the used slave station)
6.
Network diagnostics
Using line test, check if the cables are connected properly and communication is performed normally with the configured
parameters.
For details, refer to the following.
(Page 99 Checking the System Status)
7.
Programming
Create a program. For details, refer to the following.
(Page 72 PROGRAMMING)
8.
Debug
Debug the program by using CC-Link diagnostics. (Page 99 Checking the System Status)
3 PROCEDURES UP TO OPERATION