Hide thumbs Also See for HTZ-7:
Table of Contents

Advertisement

HTZ-7, HTZ-C7, HTZ-SW7, HTZ-ST7
QQ
3 7 63 1515 0
13
The AC-3 unit also can
be removed without
removing the bridge,
but in this case, a
screwdriver of 15 cm or
more should be used
for the bit part.
14
× 1
AC-3 Unit
TE
L 13942296513

7.2.4 TEST MODE

DVD Center Unit (HTZ-C7)
1. Entry into test mode
Perform power ON after short-circuiting the "TEST MODE" pin of
the MOTHER assy during power OFF or transmit "ESC+TEST"
with the test mode remote control unit (GGF1067).
The power will be switched on and AV controller test mode will be
entered. The standby LED of the main unit flashes during AV
controller test mode. (Refer to Fig. 1.)
MOTHER ASSY
W5029
W5030
GGF1067
Test mode
remote control unit
www
.
116
http://www.xiaoyu163.com
× 2
Bridge
14
× 1
OR
ESC
TEST
x
ao
y
i
Fig. 1
Entry into test mode
http://www.xiaoyu163.com
8
15
× 2
Bridge
× 2
Q Q
3
6 7
1 3
I
MOTHER ASSY
u163
.
2 9
9 4
2 8
17
AMP Assy mounting screw
Top: × 8
Side: × 5
× 2
× 2
× 2
AMP ASSY
CN3027
16
1 5
0 5
8
2 9
9 4
Front
SIDE B
m
co
W5030
W5029
9 9
× 2
2 8
9 9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Htz-sw7Htz-c7Htz-st7

Table of Contents