Setting Up The Switch - HP OfficeConnect 1850 6XGT 2XGT/SFP Series Quick Setup Manual And Safety/Regulatory Information

Officeconnect 1850 series
Table of Contents

Advertisement

Setting up the switch

1.
Unpack and check included parts.
Documentation kit
Switch
Accessory kit (installation hardware)
AC power cord for 1850-8XG, 1850-24G, 1850-24G-POE+, 1850-48G, and
1850-48G-POE+ switch models
2.
Prepare for installation. To avoid personal injury or product damage, review the
"Installation and safety precautions" (page
3.
Power on and verify that the Self-Test completes normally. For the 1850-8XG, 1850-24G,
1850-24G-POE+, 1850-48G, and 1850-48G-POE+ switches, connect the power cord to the
power connector at the back of the switch, and then into an electrical outlet.
4.
Mount the switch. Unplug the AC power from the switch before mounting it.
Rack mounting: Use a #1 Phillips (cross-head) screwdriver to attach the accessory kit
brackets to the switch using the eight 8-mm M4 screws. Then use four 12-24 screws to
secure the brackets to the rack.
24–port and 48–port switches:
NOTE:
4-post racks and cabinets by using the HPE X410 1U Universal 4-post Rack Mounting Kit
(J9583A). For instructions on using the kit, see the documentation that is included with the
kit.
4
HPE OfficeConnect 1850 Switch Series Quick Setup Guide and Safety/Regulatory Information
The HPE OfficeConnect 24-port and 48-port switches can also be mounted in
3).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Officeconnect 1850 24g 2xgtOfficeconnect 1850 48g 4xgt

Table of Contents