Download Print this page

Yamaha QL5 Service Manual page 48

Digital
Hide thumbs Also See for QL5:

Advertisement

QL5/QL1
A-7.
JK Circuit Board Assembly
(Time required: About 10 minutes)
A-7-1
Remove the side pad assembly L and R. (See Procedure 1)
A-7-2
Fix the control panel S assembly. (See procedure 2)
A-7-3
Remove the DA circuit board. (See procedure A-6)
A-7-4
Remove the two (2) screws marked [480A], two (2)
screws marked [480B], four (4) screws marked [490]
and two (2) lock nuts. The JK circuit board assembly
can then be removed. (Fig. 6)
*
When installing the JK circuit board assembly, first
tighten the screws marked [480A], [490] and lock
nuts and then tighten the screws marked [480B].
(Fig. 6)
A-8.
Power Supply Unit
(Time required: About 10 minutes)
A-8-1
Remove the side pad assembly L and R. (See Procedure 1)
A-8-2
Fix the control panel S assembly. (See procedure 2)
A-8-3
Remove the DA circuit board. (See procedure A-6)
A-8-4
Remove the four (4) screws marked [360]. The power
angle top can then be removed. (Fig. 6)
*
When installing the power angle top, tighten the
screws A to D shown in fig. 6 in numerical order.
A-8-5
Remove the fi ve (5) screws marked [340]. The power
supply unit can then be removed. (Fig. 6)
*
The earth film is not part of the power supply unit.
Install a new earth film when replacing the power
supply unit. (Fig. 6)
A-9.
DNT1 Circuit Board, DANTE Module
32ch
(Time required: About 14 minutes)
A-9-1
Remove the side pad assembly L and R. (See Procedure 1)
A-9-2
Fix the control panel S assembly. (See procedure 2)
A-9-3
Remove the FX circuit board. (See procedure A-2)
A-9-4
Remove the HAAD (1/2, 2/2) circuit board.
(See procedure A-5)
A-9-5
Remove the two (2) screws marked [520A], screw
marked [520B] and four (4) screws marked [530]. The
DNT1 circuit board can then be removed. (Fig. 7)
*
When installing the DNT1 circuit board, first tighten
the screws marked [520B] and screw marked [530]
and then tighten the screws marked [520A]. (Fig. 7)
A-9-6
To remove the DANTE module 32ch on the DNT1
circuit board, open the hooks on the portion A outward
as in Photo 3, lift the DANTE module 32ch and pull
out obliquely upward.
*
To install the DANTE module 32ch, insert securely
until the terminal cannot be seen while fitting the
contact point of the terminal to the connector to be
connected, push in backward and fasten with the
hooks.
*
After replacing DANTE module, be sure to update
the firmware.
48
A-7.
JK シート Ass'y
A-7-1
サイドパッド Ass'y L, R を外します。 (1 項参照)
A-7-2
コンパネ S Ass'y を固定します。 (2 項参照)
A-7-3
DA シートを外します。 (A-6 項参照)
A-7-4
[480A] の ネ ジ 2 本 と [480B] の ネ ジ 2 本 と [490]
のネジ 4 本とロックナット 2 個を外して、 JK シー
ト Ass'y を外します。 (図 6)
JK シ ー ト Ass'y シ ー ト を 取 り 付 け る 際 は、[480A]
のネジと [490] のネジとロックナットを締めてから
[480B] のネジを締めてください。 (図 6)
A-8.
電源ユニット
(所要時間:約 10 分)
A-8-1
サイドパッド Ass'y L, R を外します。 (1 項参照)
A-8-2
コンパネ S Ass'y を固定します。 (2 項参照)
A-8-3
DA シートを外します。 (A-6 項参照)
A-8-4
[360] のネジ 4 本を外して、パワーアングルトッ
プを外します。 (図 6)
パワーアングルトップを取り付ける際は、図 6 に示す
A → D の順にネジを締めてください。
A-8-5
[340] のネジ 5 本を外して、電源ユニットを外し
ます。 (図 6)
アースフィルムは、電源ユニットの構成部品ではあり
ません。電源ユニットを交換する際には、新しいアー
スフィルムを取り付けてください。 (図 6)
A-9.
DNT1 シート、ダンテモジュール 32CH
(所要時間:約 14 分)
A-9-1
サイドパッド Ass'y L, R を外します。 (1 項参照)
A-9-2
コンパネ S Ass'y を固定します。 (2 項参照)
A-9-3
FX シート Ass'y を外します。 (A-2 項参照)
A-9-4
HAAD(1/2, 2/2)シートを外します。
(A-5 項参照)
A-9-5
[520A] の ネ ジ 2 本 と [520B] の ネ ジ 1 本 と [530]
のネジ 4 本を外して、DNT1 シートを外します。
(図 7)
DNT1 シートを取り付ける際は、 [520B] のネジと [530]
のネジを締めてから [520A] のネジを締めてください。
(図 7)
A-9-6
DNT1 シ ー ト に 付 い て い る ダ ン テ モ ジ ュ ー ル
32CH を外すには、写真 3 のように A 部のフッ
クを外に開いてダンテモジュール 32CH を浮か
せて、斜め上方向に引き抜きます。
ダンテモジュール 32CH を取り付けるには、差し込
み先のコネクタに端子の接点を合わせながら端子が見
えなくなるまでしっかりと差し込み、奥に押し込んで
フックに引っ掛けます。
ダンテモジュールを交換した際は、必ずファームウェ
アのアップデートを行ってください。
(所要時間:約 10 分)

Advertisement

Chapters

loading

This manual is also suitable for:

Ql1