CT/PT Modules,
CT input wiring must be shorted externally before servicing the CT
!
transformers
Open circuiting a Feeder CT will result in feeder voltage being present at the
secondary of the CT.
Removing or
Replacing the
These Hazardous Voltages may result in equipment damage, shock, burns or
CT/PT
death
Transformers
Note
Before accessing the transformers, you must remove the modules mounted
directly above.
Refer to the procedures on the previous page for removal/replacement of
those modules.
Background
Due to the stiffness of the wires on the primary of the standard 5 A CTs, the
transformers are manufactured with wires of two different lengths, to
facilitate easier assembly into the bottom of the D25 enclosure.
The part numbers are as follows:
Standard short lead 5 A CT:
Standard long lead 5 A CT:
The optional 42 X 5 A CTs are manufactured with both long and short
primary wires. The unused wire should be removed from the transformer
when installed.
42 X Overcurrent long/short lead 5 A CT:
If replacement 5 A CTs are required, be sure to order the transformer with the
correct lead length.
Note
Standard and 42 X overcurrent 1 A CTs, and all PTs, have leads flexible
enough that two types are not required.
GE Information
Continued
450-0087
450-0088
450-0108
994-0081-3.00-21
D25
User's Manual
135

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents