Manual Pulse Generator Operation Execution Procedure - Mitsubishi Electric QD77MS User Manual

Hide thumbs Also See for QD77MS:
Table of Contents

Advertisement

11.4.2 Manual pulse generator operation execution procedure

Preparation
Refer to Chapter 5
and Section 11.4.3.
Refer to Section
11.4.4.
Manual pulse
generator operation
start
Monitoring of the
manual pulse
generator operation
Manual pulse
generator operation
stop
The manual pulse generator operation is carried out by the following procedure.
STEP 1
Set the parameters.
(
Pr.1
STEP 2
Create a sequence program in which the
"
Cd.20
Manual pulse generator 1 pulse input
magnification" is set. (Control data setting)
Create a sequence program in which the enable
/disable is set for the manual pulse generator
operation. ("
Cd.21
enable flag" setting.)
STEP 3
Write the sequence program created in STEP1
and STEP2 to the PLC CPU.
STEP 4
Issue a command to enable the manual pulse
generator operation, and input the signals from
the manual pulse generator.
STEP 5
Monitor the manual pulse generator operation.
STEP 6
End the input from the manual pulse generator,
and issue a command to disable the manual
pulse generator operation.
End of control
REMARK
Mechanical elements such as limit switches are considered as already installed.
Parameter settings work in common for all control using the Simple Motion module.
to
Pr.24
,
Pr.89
)
Manual pulse generator
11 - 28
Chapter 11 Manual Control
One of the following two methods can be used.
<Method 1>
Directly set (write) the parameters in the Simple Motion
module using GX Works2.
<Method 2>
Set (write) the parameters from the PLC CPU to the Simple
Motion module using the sequence program.
Cd.21
Write "1" in "
Manual pulse generator enable
flag", and operate the manual pulse generator.
Monitor using GX Works2.
Stop operating the manual pulse generator, and write "0"
in "
Cd.21
Manual pulse generator enable flag".

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents