Display Scheduler Schedule - HP FlexFabric 7900 Series Command Reference Manual

Hide thumbs Also See for FlexFabric 7900 Series:
Table of Contents

Advertisement

Related commands
scheduler reboot at
scheduler reboot delay

display scheduler schedule

Use display scheduler schedule to display schedule information.
Syntax
display scheduler schedule [ schedule-name ]
Views
Any view
Predefined user roles
network-admin
network-operator
mdc-admin
mdc-operator
Parameters
schedule-name: Specifies a schedule by its name, a case-sensitive string of 1 to 47 characters. If
you do not specify this option, the command displays information about all schedules.
Examples
# Display information about all schedules.
<Sysname> display scheduler schedule
Schedule name
Schedule type
Start time
Last execution time
Last completion time : Tue Dec 27 10:44:47 2015
Execution counts
-----------------------------------------------------------------------
Job name
shutdown
Table 35 Command output
Field
Schedule type
Start time
Last execution
time
Last completion
time
Execution counts
: shutdown
: Run once after 0 hours 2 minutes
: Tue Dec 27 10:44:42 2015
: Tue Dec 27 10:44:42 2015
: 1
Description
Execution time setting of the schedule. If no execution time is specified, this field is not
displayed.
Time to execute the schedule for the first time. If no execution time is specified, this
field is not displayed.
Last time when the schedule was executed. If no execution time is specified, this field
is not displayed. If the schedule has never been executed, "Yet to be executed" is
displayed for this field.
Last time when the schedule was completed. If no execution time is specified, this field
is not displayed.
Number of times the schedule has been executed. If the schedule has never been
executed, this field is not displayed.
Last execution status
Successful
223

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents