OPERATION
MACHINE COMPONENTS
4
2
12
15
1. Recovery Tank
2. Solution Tank
3. Recovery Tank Lid
4. Solution Tank Lid
5. Vacuum Switches
6. Pump Switch
7. Heater Switches
8. Heater On Indicators
MACHINE SETUP
1. Carefully check carton for signs of damage.
Report damages at once to carrier. The machine
is shipped fully assembled and is ready for use.
2. Connect hoses and tool to be used (Figure1).
Fig. 1
3. Using a clean bucket or hose, fill solution tank
with 41 liters (11 gallons) of hot water, 60° C
(140° F) maximum (Figure 2).
4
3
1
7
8
5
14
10
13
11
9. Power Cord Connectors
10. Empty-Out Nozzle
11. Pressure adjustment Valve
12. Latches
13. Recovery Tank Drain
14. Separate Circuit Indicator Light
15. Solution Hose Connector
16. Preheat / Clean Valve
WARNING: Flammable materials can cause an
explosion or fire. Do not use flammable materials
in tank(s).
4. Add a recommended cleaning chemical.
FOR SAFETY: When using machine, follow
mixing and handling instructions on chemical
containers.
Fig. 2
6
5
8
7
9
16
36445N3 (02-09)