Holes For Mounting The 2 M Rail - Siemens SIMATIC S7-300 Hardware And Installation Manual

Hide thumbs Also See for SIMATIC S7-300:
Table of Contents

Advertisement

Installation
Preparing the 2 m rail for installation
1. Cut the 2 m rail to the required length.
2. Mark out:
four bores for the fixing screws (for dimensions refer to "Dimensions for
fixing holes")
one hole for the protective conductor bolt.
3. If the length of your rail exceeds 830 mm, you must stabilize it by providing
additional holes for fixing it with more screws.
Mark out these holes along the groove in the middle section of the rail (see the
Figure below). The pitch should be approx. 500 mm.
4. Drill the marked holes to a diameter of 6.5
5. Attach an M6 screw for fixing the ground conductor.
Groove for drilling
extra fixing screw
Hole for connection
of protective conductor
Figure 6-1 Holes for mounting the 2 m rail
6-4
+0.2
mm for M6 screws.
Hole for fixing screw
Drilled hole for extra
Fixing screw
Hole for the fixing screw
S7-300 Programmable Controller Hardware and Installation
A5E00105492-02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents