Commissioning

Flowchart
The commissioning guide below explains the individual steps for commission-
ing the OP27 and OP37. Figure 14-1 provides a diagram of the most important
steps for initial startup, recommissioning and normal operation of the OP.
Initial startup
Neither a configuration nor
firmware is available on the
OP.
Transfer configuration data to the OP
ProTool
COM1/2
Figure 14-1 Commissioning flowchart
OP27, OP37 Equipment Manual
Release 05/99
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Recommissioning
The OP already has a config-
uration but must now use a
new configuration or firmware.
Switch on the OP power supply
Set the OP to Download mode in the
startup phase (refer to Section 14.2)
OP
IF2
Start screen
14
Normal operation
The OP is operated with the
loaded configuration.
14-1