GE L90 Instruction Manual page 332

Line differential relay ur series
Hide thumbs Also See for L90:
Table of Contents

Advertisement

7.2 TARGETS
Table 7–2: MAJOR SELF-TEST ERROR MESSAGES
SELF-TEST ERROR
MESSAGE
DSP ERRORS:
A/D Calibration, A/D
Interrupt, A/D Reset, Inter
DSP Rx, Sample Int, Rx
Interrupt, Tx Interrupt, Rx
Sample Index, Invalid
Settings, Rx Checksum
DSP ERROR:
INVALID REVISION
EQUIPMENT MISMATCH
with 2nd-line detail
FLEXLOGIC ERR TOKEN
with 2nd-line detail
LATCHING OUTPUT
ERROR
PROGRAM MEMORY
Test Failed
UNIT NOT CALIBRATED
UNIT NOT PROGRAMMED No
Table 7–3: MINOR SELF-TEST ERROR MESSAGES
SELF-TEST ERROR
LATCHED
MESSAGE
TARGET
MESSAGE
BATTERY FAIL
Yes
DIRECT RING BREAK
No
DIRECT DEVICE OFF
No
EEPROM DATA
Yes
ERROR
IRIG-B FAILURE
No
7
LATCHING OUT
Yes
ERROR
LOW ON MEMORY
Yes
PRI ETHERNET FAIL
Yes
PROTOTYPE
Yes
FIRMWARE
REMOTE DEVICE OFF No
SEC ETHERNET FAIL
Yes
SNTP FAILURE
No
SYSTEM EXCEPTION
Yes
WATCHDOG ERROR
No
7-4
LATCHED
DESCRIPTION OF PROBLEM
TARGET
MESSAGE?
Yes
CT/VT module with digital signal
processor may have a problem.
Yes
One or more DSP modules in a
multiple DSP unit has Rev. C
hardware
No
Configuration of modules does not
match the order code stored in the
CPU.
No
FlexLogic™ equations do not
compile properly.
No
Discrepancy in the position of a
latching contact between firmware
and hardware has been detected.
Yes
Error was found while checking
Flash memory.
No
Settings indicate the unit is not
calibrated.
PRODUCT SETUP !"
INSTALLATION setting indicates
relay is not in a programmed state.
DESCRIPTION OF PROBLEM
Battery is not functioning.
Direct input/output settings
configured for a ring, but the
connection is not in a ring.
A direct device is configured but
not connected.
The non-volatile memory has been
corrupted.
A bad IRIG-B input signal has been
detected
Latching output failure.
Memory is close to 100% capacity. Monitored every 5 seconds.
Primary Ethernet connection failed. Monitored every 2 seconds
A prototype version of the firmware
is loaded.
One or more GOOSE devices are
not responding.
Sec. Ethernet connection failed.
SNTP server not responding.
Abnormal restart from modules
being removed/inserted when
powered-up, abnormal DC supply,
or internal relay failure.
Some tasks are behind schedule.
L90 Line Differential Relay
7 COMMANDS AND TARGETS
HOW OFTEN THE
TEST IS PERFORMED
Every 1/8th of a cycle.
Rev. C DSP needs to be replaced
with a Rev. D DSP.
On power up; thereafter, the
backplane is checked for missing
cards every 5 seconds.
Event driven; whenever Flex-
Logic™ equations are modified.
Every 1/8th of a cycle.
Once flash is uploaded with new
firmware.
On power up.
On power up and whenever the
RELAY PROGRAMMED setting is
altered.
HOW OFTEN THE
TEST IS PERFORMED
Monitored every 5 seconds. Reported
after 1 minute if problem persists.
Every second.
Every second.
On power up only.
Monitored whenever an IRIG-B signal
is received.
Event driven.
On power up only.
Event driven – occurs when a device
programmed to receive GOOSE
messages stops receiving. Every 1 to
60 s, depending on GOOSE packets.
Monitored every 2 seconds
10 to 60 seconds.
Event driven.
Event driven.
WHAT TO DO
Cycle the control power (if the problem
recurs, contact the factory).
Contact the factory
Check all modules against the order
code, ensure they are inserted
properly, and cycle control power (if
problem persists, contact factory).
Finish all equation editing and use self
test to debug any errors.
The latching output module failed.
Replace the Module.
Contact the factory.
Contact the factory.
Program all settings (especially those
under PRODUCT SETUP !"
INSTALLATION).
WHAT TO DO
Replace the battery located in the
power supply module (1H or 1L).
Check direct input/output configuration
and/or wiring.
Check direct input/output configuration
and/or wiring.
If this message appears after an order
code update is preformed, press the
RESET key to clear target message. In
other cases, contact the factory.
Ensure the IRIG-B cable is connected,
check cable functionality (i.e. look for
physical damage or perform continuity
test), ensure IRIG-B receiver is
functioning, and check input signal level
(it may be less than specification). If
none of these apply, contact the factory.
Contact the factory.
Contact the factory.
Check connections.
Contact the factory.
Check GOOSE setup.
Check connections.
Check SNTP configuration and/or
network connections.
Contact the factory.
Contact the factory.
GE Multilin

Advertisement

Table of Contents
loading

Table of Contents