3. Insert the end of the cable-retaining bracket (provided with the bus bar and power bus
boxes) into the cable bracket (1).
4. Tighten the thumbscrew to secure the cable retaining bracket over the cables (2).
Figure 2-3: Installing the cable-retaining bracket
5. Repeat steps 2 through 4 for the network cables on the left side of the rack.

Powering Up the GbE2 Interconnect Switch

If the server blade enclosure has power applied, the GbE2 Interconnect Switch automatically
begins to power up when installed. The power status LED on the front of the GbE2
Interconnect Switch starts out as amber to indicate that power is connected to the GbE2
Interconnect Switch. After 30 seconds, the power status LED turns to green to indicate that
the GbE2 Interconnect Switch is powered up. After the built in self-test flashes all LEDs, the
active links are illuminated, and the power status LED stays green.
You can manually force the GbE2 Interconnect Switch to power up by pressing the Pwr/Rst
button through the access hole in the front panel of the GbE2 Interconnect Switch while the
power status LED is amber. HP recommends using a small blunt object for this purpose.
IMPORTANT: If the server blade enclosure does not have power applied, refer to the System Setup
and Installation Guide for the server blade enclosure.
HP ProLiant BL p-Class GbE2 Interconnect Switch User Guide
HP CONFIDENTIAL Codename: Strawberry Part Number: 331399-001 Last Saved On: 7/17/03 2:22 PM
CAUTION: Pressing the Pwr/Rst button while the power status LED is green will reset the
GbE2 Interconnect Switch.