4 Option Components
4
Option Components
◆
PROFIBUS-DP SI-P3 Option
Figure 1
Communication connector
bottom view
A – Connector (CN5)
B – Installation hole
C – LED (RUN)
D – LED (COMM)
E – LED (BF)
<1>
Refer to Option LED Display on page 11
<2> The ground wire provided in the option shipping package must be connected during installation.
10
H
I
SI-P3
G
<1>
<1>
<1>
for details on the LEDs.
Figure 1 PROFIBUS-DP Option Components
YASKAWA ELECTRIC TOBP C730600 42D 1000-Series Option SI-P3 Installation Manual
FE
F – LED (ERR)
<1>
G – Ground terminal and installation hole
H – Communication cable connector
I – Model number
B
Underside
C
D
<2>
A