Connecting Chassis Ground - Cisco 2000 4xGBE Quick Start Manual

Service control engine
Table of Contents

Advertisement

3
Connecting Power Supply Units
The SCE 2000 platform is shipped with the power supplies (AC or DC) already installed. This section provides information for
grounding the SCE 2000 platform and connecting the AC or DC power supply units.

Connecting Chassis Ground

Figure 10
Grounding the Unit (AC)
BY PA SS
2
BY PA SS
1
IN
PO WE R B
OK
IN
PO WE R A
OK
1
2
Figure 11
Grounding the Unit (DC)
BY PA SS
2
BY PA SS
1
IN
PO W ER B
OK
IN
PO W ER A
1
2
A grounding kit is provided with each SCE 2000. Use this grounding kit to properly ground the SCE 2000 chassis.